Pharmaceutical quality system:
- All processes are described in standard operating procedures (SOP);
- Highly qualified staff;
- Continuous training system;
- Risk management;
- Validation and qualification.
Engineering and technical facilities:
- Independent ventilation, air conditioning and heating systems with a high redundancy level;
- Emergency diesel power generator and two independent power supply lines;
- High-quality refrigerating chambers;
- Computerized systems for storage conditions monitoring and facility management;
- Restricted access control system and security alarm;
- Round-the-clock control point for the monitoring of all engineering systems, security and video surveillance point;
- 24/7 access to video surveillance and monitoring records.
Modern logistic processes:
- Warehouse process management using WMS Logistics Vision 3+ computerized system;
- Client-friendly reports;
- 10 m high DoubleDeep shelf system;
- Modern loading equipment;
- No goods flow overlaps (IN / OUT).
Copyright © 2002-2024 «ULG» является зарегистрированой торговой маркой. Все права защищены